How to price a job as a tradesperson

Most underpriced jobs are not underpriced on the big items. They lose money on the day rate nobody worked out properly and the small things nobody wrote down.

A tradesperson in a van working out job costs on a spreadsheet
Work the numbers out before you quote, not after the job.

Start with a day rate you have actually worked out

A day rate copied from the firm down the road tells you what they charge, not what you need. Work it out from the other end: what you want to earn in a year, plus what the business costs to run, divided by the days you can really bill.

Billable days are fewer than people think. Take 52 weeks, knock off holidays and bank holidays, then lose another fifth to quoting, driving to the merchant, paperwork, weather and gaps between jobs. For most sole traders that leaves somewhere around 180 to 190 paid days a year.

ExamplePer year
What you want to earn before tax£40,000
Van and fuel£6,000
Insurance£700
Tools and kit£1,200
Phone, software, accountant£1,100
Total to cover£49,000
Paid days (46 weeks × 5, less 20%)184
Day rate needed£266 → round to £270

Put your own figures into the day rate calculator and it does the sums for you.

Count the days honestly

Break the job into stages and put days against each one: strip out, first fix, boarding, tiling, second fix, snagging. Then add the time that is easy to forget - the morning you spend collecting materials, waiting for plaster to dry, the half day of making good at the end.

If a stage depends on another trade turning up, add half a day. It is cheaper to finish early than to work a day for free.

Materials: price them, then add handling

Price materials at what you will really pay, not the trade counter's best day. Then add a handling charge, usually 10 to 20%, for the time spent choosing, ordering, collecting, storing and returning things. Clients accept this when the quote says it plainly.

Price your next job line by line from photos on site.

Try it free

No card needed

The things that get left off

  • Skip or waste removal (and the permit if it sits on the road)
  • Sundries: fixings, sealant, adhesive, tape, sheeting, dust protection
  • Making good after other trades - patching, filling, touching up
  • Parking, congestion charges and tolls in towns
  • An extra trip to the merchant for the thing nobody mentioned
  • Building control or certification fees where the job needs them
JobGuard listing items a job probably needs that were not mentioned
JobGuard lists what the job probably needs that you did not mention, before the quote goes out.

A worked example

A small bathroom refit, priced with the £270 day rate above. These are example figures to show the method, not a price for your area.

LineAmount
Labour: 5 days × £270£1,350
Materials at trade price£1,400
Handling on materials (10%)£140
Skip and waste£220
Sundries and making good£90
Total before VAT£3,200

If you are VAT registered, VAT goes on top. Either way, show the client the lines, not just the total - a broken-down price is easier to accept and harder to haggle line by line.

Write down what is not included

The cheapest protection you have is a sentence that says what you have not priced: rotten joists under the floor, moving the soil stack, the client's own tiles arriving late. When one of those turns up, it becomes extra work with a price agreed before you start, not an argument.

Price your next job line by line from photos on site.

No card needed

Questions

Should I charge by the day or a fixed price?

Clients prefer a fixed price for a clear scope. Use your day rate to build it, and keep a day rate for work that cannot be scoped, like repairs once things are opened up.

How much should I add for materials handling?

Commonly 10 to 20%. Higher for small orders that take a lot of running about, lower for big orders delivered straight to site.

Should I add a contingency?

Rather than a vague contingency, list what is excluded and price surprises as extra work when they happen. Clients trust that more than a padded total.